buildersacademy.instructure.com | My Assignment Tutor

COO 4G ■ buildersacademy.instructure.com 0 Assessment Task: Scenario:You are supervising the construction on Project No.43324 a. The Project is in an N1/N2 Wind Classification Area. You have arrived on site to check on progress and quality. The carpenter has advised you that the wall framing is complete. You are looking at Elevation B. The drawing below is the frame that has been constructed. Drawing has also been provided to you, refer to Timber Wall Systems file.The wall has been specified as needing 9kN of Bracing. No bracing has been installed.For this task, you need to refer to the Low Rise Structures – AT Worksheets K): and refer to the following worksheets:• Timber Wall System Worksheet (Page 2 of Low Rise Structures – AT Worksheets) • Brick Wall System Compliance Worksheet 1 (Page 4 of Low Rise Structures – AT Worksheets) and • Brick Wall System Compliance Worksheet 2 (Page 5 of Low Rise Structures – AT Worksheets) Part A Part B Part C Part DPart A – Residential Wall System ComplianceL► Assessment Instructional Video▪ Oj•

QUALITY: 100% ORIGINAL PAPER – NO PLAGIARISM – CUSTOM PAPER

Leave a Reply

Your email address will not be published. Required fields are marked *