relate to the substructure element of work | My Assignment Tutor

This coursework requires you to submit a substructure take off, and associated Bill Of Quantities, for the Edwinstowe Sport Pavilion. All work will relate to the substructure element of work. This task is based on the drawings provided and the additional specification details, all as detailed below: P/011 – 09 – Foundation Layout P/011 – 12 – Setting Out Plan P/011 – 15 – Section Details Other drawings of the project are available on NOW for information purposes only, and are not required for the task. These have been provided to give you some more context and an overview of the project. TASK 1 – Substructure Measurement (70%) You are to measure and submit a substructure take off, on dimension paper, for the scheme in accordance with the enclosed take off list. You are to measure all items associated with the substructure element. This means you have to measure the quantities for ALL items of the substructure element as detailed in the take-off list provided below. You are to complete the work on dimension paper and provide all waste calculations, measured dimensions and a full NRM description for each item. TASK 2 – Bill of Quantities (10%) Your second task is to produce, and submit, a Bill of Quantities based on your substructure take off. A template of this document is provided on NOW. You must use this template and ensure your work is of a professional standard. Your BQ is to include full specifications, NRM2 descriptions and quantities. Remember that the BQ items should be in the order that is presented in NRM2. Additional Guidance Work through the take-off list item by item.Refer to the NOW pages for notes on substructure measurement.Refer to the NOW pages for a detailed example of a substructure take off.Refer to the NOW pages for a diagrammatic take off list to support the list provided below.Check through your calculations as some are used more than once – accuracy is a key part of this task.Use the provided take-off list and additional specification to assist you in this task.Do not underestimate how long this task will take to complete. TAKE OFF LIST excavating top soil – m2retaining top soil on site – m3excavating to reduce level – m3retaining spoil on site – m3excavating trenches – m3retaining spoil on site – m3compacting bottom of trench excavation – m2concrete in foundation – m3Engineering brickwork – m2100mm thick Blockwork – m2 (Careful with the cavity walls – these need to be separate)140mm thick Blockwork – m2 (Careful with the cavity walls – these need to be separate)forming cavity – m2Concrete infill – m3DPC – mfilling to excavation, arising from excavation – m2filling to excavation, arising from excavated topsoil – m2filling to excavation, hardcore – m3ground floor constructioncompacting ground – m2hardcore – m3compacting filling, blinding with sand – m2insulation – m2damp proof membrane – m2concrete bed – m3DPM abutment to walls – mVertical Insulation – m ADDITIONAL GUIDANCE Specification Relating To Coursework Please allow for the following which takes precedence over any conflicting information on the drawing :- Topsoil is to be taken as 150mm thick and stored for reuse 50m away from excavation.Brickwork is 103mm thick, this is to be used for any calculations that require it.Assume a standard DPC to all walls 150mm above ground levelConcrete foundations to be 21N/mm2, 20mm Aggregate.140mm and 100mm Blockwork is to be Tarmac Topcrete common blockwork, stretcher bond with cement mortar (1:3).Brickwork is to be Engineering brickwork to BS3921, stretcher bond with cement mortar (1:3).DPC to be Hyload pitch polymer, 1200 gauge.Cavities to be formed with Ancon SD1 stainless wall ties, 900 horizontal centres and 450 vertical centres.Cavities to be filled with C15 grade in-situ concrete up to DPC level.Hardcore to be DOT Type 1.Concrete floor to be C20 grade.Insulation to be 50mm Styrofoam FloormateDPM to be Hyload, 1200 gauge Presentation Requirements Task 1 must be in dimension paper format.Work can be hand written and then scanned.Scanned submission must be in one single file – not multiple scans/photos.All pages must be numbered.Copies of marked up drawings may be submitted for clarity if required.Make sure you proof read and check your calculations. Task 2 must be in Excel format, using the template provided.Work should be of a professional standard, with clear, numbered pages, and in accordance with the rules of BQ production. Module Learning Outcomes Knowledge and understanding. After studying the module you should be able to:- Recognise and explain the purpose and need for measurement including its impact upon the practice of measurement and the management of construction costRecognise and explain the importance of estimating quantities and establishing the outline costDemonstrate the relationship between construction, cost and time Skills, qualities and attributes. After studying the module, you should be able to:- Apply measurement skills to domestic construction workApply measurement conventionProduce simple estimates of quantities, time and cost for parts of domestic structureCommunicate effectively in oral, written and graphical format incorporating relevant informationUse numbers accurately and apply quantitative techniques to given scenarios

QUALITY: 100% ORIGINAL PAPER – NO PLAGIARISM – CUSTOM PAPER

Leave a Reply

Your email address will not be published. Required fields are marked *